Electrical Engineering Building
The 1st floor now has a new boardroom comprising a 65″ screen with control panel and AV inputs/power mounted on the desk. The ground floor seminar room has also been upgraded with a drop down screen, projector, lectern and touch control system all similar to the main site boardroom.
James Dyson Building
The meeting rooms are now all fully functional with 65″ screens, control panel and AV inputs. We have also mounted basic webcams in each of the rooms with USB connectors to allow quick and easy web-based video calls on your laptops e.g. Skype, WebEx.
Main Site
Oatley 2 Meeting Room has been returned to service with the installation of a basic projector, screen and lectern PC as per other main site meeting rooms and is now available for use.
LR3, LR5 and LR10 have all had their projector screens replaced- LR11, LR3A and LR3B will follow suit over the coming weeks.
Leave a Reply
You must be logged in to post a comment.